Sort by
Borey Sambath Meanheng III (Construction / Building / Architecture)
- Check MEP drawing - Develop MEP drawing and detailed design specifications- Prepare schedule and Planning and leader of the work on site- Site control the MEP work with sub-contractor/contractors- Site control the MEP work with sub-contractor/contractors- Manage on site technician- Check MEP technical installation on site.- Progress and MEP report to MEP manager
Full Time | Phnom Penh | Junior Executive | Industrial Engineering
Kao Cheng International Enterprise Co.,LTD高呈国际企业有限公司 (Property / Real Estate)
- PROJECT MANAGEMENT ON MEP ENGINEERING- Quality and Quantity Supervision on site.- Calculate and Design ability in MEP Field.- Periodic report to manager for work progress- 监督工地施工品质- 协调,沟通执行施工工程进度- 有工程缺失立即反映处理,追踪改善。
Full Time | Phnom Penh | Junior Executive | Industrial Engineering
CTEC COMPANY LIMITED (General Business)
- Perform engineering duties in planning, designing, and overseeing construction.- Be capable of using surveying machines and analyze survey reports, maps, and drawing.- Ensure the project implementation followed the approved drawing and requirement of safety, quality, deadline and quantity of materials and workforce.- Do daily report, Identify project problem and propose solution to management.- Perform other related tasks as assigned by management
Full Time | Phnom Penh | Junior Executive | Industrial Engineering
Suosdey Works Pte Ltd. (Engineering)
- Assist in preparation and implementation of Project Execution Plan;- Be able to develop Bill of Quantity for a project;- Be able to develop construction drawings for client’s review and approval;- Ensuring all procedures and calculations are submitted to the client for review and approval;- Attend the weekly/monthly progress meetings (Internal as well as with Client) and assist in preparation of minutes of meetings;- Monitor work in progress and prepares weekly report of the status of each assignment;- Coordinate materials and assists in the logistics, its shipment and receipt at construction site;- Maintain safe and clean working environment by enforcing procedures, rules, and regulations;- Coordinates with all project’s related personnel (internal and external) on day-today progress of work activities, procurement and operations to ensure timely completion of the project;- Maintain company reputation by complying with all applicable regulations; and- Provide full support as required by the Management for all projects.
Full Time | Phnom Penh | Junior Executive | Industrial Engineering
C&J Clark International Limited (Manufacturing / Production)
*** Core Accountabilities:1 To review new style ideas in advance of handover for commercialisation, advise on areas where production problems could be expected and work with Clarks and Factory technicians to resolve the problems2 To manage the progress of approved styles from handover through to the start of bulk production ensuring that agreed timetables for production start up are communicated effectively and achieved3 To manage the technical approval of new styles after the handover and in preparation for production, ensuring that prompt and effective action is taken to resolve any problems4 To approve the pattern and component grading plan for a new style, ensuring that the sample size design characteristics are faithfully represented in the full size range of shoes intended for bulk production5 To approve the intended production process for a new style, agreeing the key quality control points and the quality control measures that will be used6 To establish the quality control references needed for each new style and arrange for these references to be available in the production factory7 To arrange for the punctual release of tooling orders (new sole moulds and upper tooling on small volume styles etc) where Clarks has cost responsibility8 To establish shoe packaging methods and specifications that will prevent shoes from being damaged during transit and storage9 To authorise bulk production to start following a successful pre-production testing process*** Key Outputs/Results 1 Pre-handover meetings arranged with Product Engineers to review newly approved stylesMeeting records taken clearly identifying any potential problems and the actions that have been agreed to resolve the problem Corrective actions are managed to a satisfactory conclusion2 A commercialisation schedule is planned and documented for all new styles, and progress against this schedule is regularly reviewed with all stakeholdersKey Milestones are accurately documented on company information systems (currently spreadsheet reports, PLM, Range Tracker and SAP) Action is taken promptly to deal with any problems or delays3. Technical testing is planned and the results are checked in detail Test failures are carefully analysed and corrective actions are agreed and implemented4 Pattern and component grading proposals are discussed and agreed with factory shoe technicians in advance of grading work starting Tooling cost, technical accuracy and aesthetic appeal are considered before finalising the plan Clear information is given to the factory regarding the range of sizes to be manufactured5 Written Factory proposals for the production method of a new style are checked and approved by the role holder prior to first bulk productionQuality standards for quality critical operations (skiving, stitching, cementing, heat fusion, finishing etc) are clearly documentedOperations where special jigs,guides and fixtures are required to control quality are highlighted6 Approved standard references for colour, material characteristics, and acceptable quality standards (for example material swatches, confirmation sample shoes, fitting standard reference shoes, leather cutting standards and finishing standards etc) are validated and available in the production factory prior to the start of bulk production7 Mould release documents are signed off on timeProduction release for small volume styles is confirmed by supply chain planning prior to the purchase of any bulk tooling8 Shoe box and outer carton sizes are confirmed for each new style, minimising excess spaceInternal shoe packaging material is specified, tested, and agreed to be fit for purpose prior the start of bulk productionInformation provided on shoe labels, pictograms and box labels is checked for accuracy9 Pre-production trial shoes meet the aesthetic and technical performance standards required by Clarks
Full Time | Phnom Penh | Junior Executive | Industrial Engineering

Stay in construction!!!

Stay in construction!!!